Skip to content
Slater, Inc.

Storm Drains

Mainline storm drain, laterals, connections and structures for public agencies, developers and general contractors across Southern California.

Request a Bid
Long steel-shored storm drain trench with pipe struts beside K-rail in a new San Jacinto housing tract

Storm drain is where Slater started in 1980, and it is still the core of what we do. For 45 years we have dug, shored, laid and backfilled storm drain for the agencies, developers and contractors building out Southern California, and built the concrete structures that go with it.

What we build

  • Mainline storm drain in reinforced concrete, HDPE and PVC pipe
  • Laterals, connector pipes and tie-ins to existing systems
  • Junction structures, transition structures, headwalls and outlets
  • Catch basins and manholes on the same line, built by the same crew
  • Storm drain for new tracts, street improvements and flood control projects

Who hires us

Public agencies and flood control districts hire us for storm drain improvements on public streets. National homebuilders and developers bring us in for backbone and in-tract storm drain on master-planned communities. General contractors use us as their storm drain sub on road, school and commercial jobs when they need a crew that shows up with its own equipment.

How we run the work

We self-perform. Our own crews run our own excavators, loaders and shoring, and we keep pipe and forming material stocked in the Fontana yard, so a line doesn’t wait on a rental or a delivery. Our estimators build a precise number from the plans, and our superintendents hold the schedule it was built on.

Our work

FAQ

Questions we get about storm drains

Do you install the pipe and build the structures, or just one?

Both. Our crews dig, shore, lay pipe, backfill and build the concrete structures on the same line, so there is no hand-off between trades.

Can you work next to live traffic and occupied homes?

Yes. A lot of our storm drain work runs through active tracts and along open roads. We plan the shoring, traffic control and phasing around the neighbors, not the other way around.

Who handles testing and inspection?

We coordinate with the agency inspector from the first pour to final walk. Mandrel, video and compaction testing are scheduled into our sequence so they don't hold up backfill.

How fast can you mobilize?

Because we keep pipe, forming material and our own equipment in the Fontana yard, we can usually start within days of notice to proceed, not weeks.

Bidding storm drains work?

Send us the plans and the bid date. Our estimating team will get you a number you can build on.